The Standard Sheet Books are also available as compiled .pdf files for the critical letting dates for which they were applicable. Download a PDF of theGlossary and Appendicesfor offline access to the Resources section. Kew Gardens, NY 11424 With advance notice of NYC DOT's intent to work in a particular location, utility companies and other potential street excavators are better able to make arrangements to minimize potential conflicts or to leverage the opportunity to perform their work before resurfacing or reconstruction is complete. FOR ANY CAPITAL WORK INVOLVING CURB-TO- CURB RESURFACING OF THE STREET,PERMITTEE AND RESIDENT ENGINEER FOR THE SPONSORING AGENCY SHALL NOTIFY THE APPROPRIATE DOT BOROUGH ADMIN. DOT Street Lighting evaluates LED luminaires using the IES BUG (Backlight, Uplight, and Glare) rating system as part of its specifications. The following are laws, rules, regulations, and design guidance documents that may be relevant to the design of streets. Building Operations/Construction Activity Permits are designated as the "02" permit series, meaning all permits in this category begin with "02". Office hours: 8:30 AM - 4:30 PM, The Bronx The NYCDOT Standard Details of Construction have been updated to include the revised H-1011 drawings covering pedestrian ramps. ALL MITIGATIONS INCLUDING: VARIABLE MESSAGE BOARDS, NYPD INTERSECTION TRAFFIC AGENTS, CONSTRUCTION, PARKING, AND BUS STOP SIGNAGE MUST IN PLACE AND MAINTAINED FOR THE LIFE OF THE PROJECT. Attn: Forestry NYC DOT is working to enhance the coordination of major planned work that impacts the streets with utility companies and other entities that perform street excavations. Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) > 619 Work Zone Traffic Control 619 SHEETS EFFECTIVE BEFORE LETTING OF MAY 1, 2022 ARE AVAILABLE IN THE TABLES BELOW Notes: 1. ALL CLOSURES ARE CONFINED TO 15 FEET TO THE NEW EAST CURB LINE. WORK 12:01 AM - 5 AM, MONDAY TO FRIDAY AND/OR SUNDAY 12:01 AM TO 8 AM, FULL CLOSURE OF ROADWAY, RESTORE FULL WIDTH WHEN SITE IS UNATTENDED. FULL WIDTH OF ROADWAY NOT REQUIRED DURING CONCRETE CURING PERIOD. REQUIRES BUREAU OF BRIDGES APPROVAL PRIOR TO WORK. PEU performs the initial review of all applications for building vault permits and licenses. DOT Street Lighting's Standard Drawings Book [PDF] includes Standard drawings for elements in the lighting catalogue. A full sidewalk accommodates both pedestrian traffic and a range of street furnishings and fixtures. Fax: (718) 815-8391. To request release of the hold, the permittee must take out a permit of record for the work that was performed without a permit and then contact HIQA to submit a copy of the permit. The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). Tel: (212) 788-6600, New York City Landmarks Preservation Commission (LPC) NYC DOT's concrete repair schedule for roadways, sidewalks and other assets in the street can also be accessed from this link. THIS PERMIT REQUIRED AN ODV PERMIT WHICH MUST BE IN THE VEHICLE FOR INSPECTION BY A POLICE OFFICER AND OR AUTHORIZED GOVERNMENTAL EMPLOYEE UPON REQUEST. PERMITTEE IS REQUIRED TO OBTAIN PLAN APPROVAL FROM DOT/PERMIT MANAGEMENT ENGINEERING REVIEW AT 212-839-9666, NYC ADMINISTRATIVE CODE, 19-142, WORKERS ON EXCAVATIONS: A PERSON TO WHOM A PERMIT MAY BE ISSUED, TO USE OR OPEN A STREET, SHALL BE REQUIRED, BEFORE SUCH PERMIT MAY BE ISSUED, TO AGREE THAT NONE BUT COMPETENT WORKERS, SKILLED IN THE WORK REQUIRED OF THEM, SHALL BE EMPLOYED THEREON, (CONT. Canopy (CAN) hold A CAN hold is automatically placed on a canopy maintenance permit application until a HIQA inspector performs a final inspection confirming the submitted plans. Manhole Embargo, Commercial Refuse Container, Temporary Plates and Shunts, Steam Tanks and Nitrogen Tanks permits are processed and stipulated directly by NYCSTREET. THE TRAFFIC STIPULATIONS ON THIS PERMIT DO NOT GO INTO EFFECT AS LONG AS THE CONTRACTOR CONTINUES TO WORK NON-STOP, AROUND THE CLOCK, TO CORRECT THE EMERGENCY SITUATION. Staten Island, NY 10301 Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. Pedestrian RampsWhen a corner is constructed, reconstructed or repaired, pedestrian ramps must be installed in accordance with NYC DOT Standard Highway Specifications found and in accordance with the most recent revision of Drawing H-1011 from the NYC DOT's Standard Details of Construction. When a need exists to develop special details similar to the standard details, consultants may request copies of the .dgn files from their NYSDOT Project Managers. FULL WIDTH OF SIDEWALK SHALL BE OPENED TO PEDESTRIANS WHEN SITE IS UNATTENDED EXCEPT FOR CONCRETE CURING WHEN THAT PORTION OF THE SIDEWALK MAY REMAIN CLOSED PROVIDED ALL OTHER STIPULATIONS ON THIS PERMIT ARE COMPLIED WITH. Check each borough in which the applicant expects to work. (212) 442-1890 Additionally, in the middle of each fiscal year, the New York City Department of Design and Construction (DDC) convenes a meeting with other agencies and utilities to discuss city projects under its purview that are expected to begin construction during the next four years. The Poles and Luminaires chart identifies which combinations of poles and luminaires are permitted. POST SIGNS MEETING NYCDOT SPECS AT WORK ZONE AND AT BOTH INTERSECTIONS DIRECTING PEDS TO OPPOSITE SIDEWALK. REQUIRES LOWER MANHATTAN BOROUGH COMMISSIONER'S OFFICE (LMBCO) REVIEW. FOR DRILLING OPERATION MAY WORK 7AM-6PM MONDAY - FRIDAY IN CURB LANE AND PART OF SIDEWALK. DO NOT PLACE MATERIALS, TRAILERS, CRANES, CONTAINERS, OR EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR BLOCKING ACCESS TO DEP WATER TESTING BOXES. serviceInformation on long-term capital programs from potential street excavators helps NYC DOT to effectively coordinate planned street work. Borough Hall, 2nd Floor Following are the specific steps for canopy authorizations and permits: A permit must be obtained to install the canopy at the approved location (Erect Canopy Permit from the "01" Street Opening Permit series). It draws from a wide range of resources and experience to present a coherent set of choices for street design. Any corrective action required by the CAR must be performed within 30 daysof the issuance of the CAR. NYC Parks & Recreation Kew Gardens, NY 11424 See, Utilize recycled content in paving materials. The Bronx Projects requiring sidewalk closure may require additional permits. PERMITTEE MUST CONTACT DOT TRAFFIC & PLANNING OFFICE BY EMAIL AT. The Street Works Manual is a tool intended to increase the performance of both city government and the private sector in this regard. WHEN POSTING SIGNS ON TREES ONLY ELASTIC BANDS MAY BE USED. The Emergency Street Opening Permit Number must be available at the site and presented to any governmental employee upon request. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Long Island City, NY 11101 RED LIGHT CAMERA CONDUIT IS LOCATED IN YOUR PROPOSED WORK AREA. Tel: 718-286-3170 CONSTRUCTION PROJECT INFORMATIONAL SIGN REQUIRED PER DOT HWY RULE SEC 2-02(C) 4 & 5. The Staten Island borough permit office also accepts applications for work on critical streets in Staten Island. If guide sheets are to be included in a project, they should be included in a subset under that project. Insurance and Permit Bonds After initial registration, active permittees must submit proof of all insurance and bonds annually. SEND RESPONSES TO NYCDOT DIV. WORK IS PERMITTED BETWEEN 9AM AND 6PM SATURDAY FOR THE SOLE PURPOSE OF DISCONNECTING THE CUSTOMER FROM THE OLD GAS MAIN, AND RECONNECTING THE CUSTOMER TO THE NEW GAS MAIN. These forms may also be found inAppendix B, Forms. All other inquiries: (212) 748-6610 The fee for reissuance may be found in Section 2-03 of the Highway Rules. Department of Transportation. Some of the requirements include but are not limited to: Expansion JointsExpansion joints must be placed at 20-foot intervals, expansion joint filler material must be placed to the full depth of the sidewalk, and all expansion joints must be recessed and sealed. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. By eliminating manual steps, most permit requests now may be approved and issued within 1-2 business days. The full list of Canopy Permit types is shown in the table. A dismissal inspection is always required to close out a violation. NYC DOT has a separate procedure for obtaining permits for emergency street opening/excavation work so that applicants can expeditiously obtain such permits. A longer-term resurfacing schedule that forecasts several months of anticipated work is distributed during borough-level monthly utility coordination meetings (seeSection 2.3 Key Principles for Effective Notice and Coordination of Planned Street Work). They should be clear, readable and in letters at least 1" in height, and conform to all NYC DOT specifications. A SEPARATE 221 PERMIT IS NOT REQUIRED FOR CAPITAL/GOVT PROJECTS. APPLICANT SHALL NOT PLACE CONTAINER IN A WAY THAT CONFLICTS WITH OTHER PERMITTED CONSTRUCTION ACTIVITIES ON THE SAME BLOCK.PERMITTEE MAY BE REQUIRED TO REMOVE CONTAINER IMMEDIATELY UPON NOTIFICATION BY NYCDOT OR AUTHORIZED GOVERNMENT EMPLOYEE. Click here to view a sample certification formand in Appendix B, Forms. Capital Project In-House (CPI) hold A CPI hold is automatically placed if the proposed permit location involves a street that will be resurfaced by a NYC DOT in-house resurfacing operation in the near future. Fax: 718-286-3183, Staten Island Tel: 718-780-8280 SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Entities that perform work in the streetsfrom utilities or contractors accessing subsurface infrastructure to property owners repairing sidewalksmust follow certain procedures when undertaking such work and must meet restoration requirements following its completion. More specific information on each permit type, including application procedures and fee structures are described in greater detail in Section 3.3 The Permit Application Process of this chapter. NO WORK EXCEPT FOR EMERGENCY WORK MAY OCCUR. As of August 31, 2017, a new Holiday Embargo (HE) review process has replaced the previously used HE waiver request process used by NYCSTREETS. See Section 3.4 Canopy Authorization and Permits for more information. THREE SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA.PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. Any given permit or permittee may be subject to one or more holds. These are in addition to the "Common Requirements" listed at the beginning of this section. Contact information pertaining to the release of holds by NYC DOT can be found in Appendix C, NYC DOT Contact Information. APPROVAL FROM NYCDOT HIQA BOROUGH OFFICE IS REQUIRED BEFORE WORK COMMENCES. NYC DOT also routinely meets with utility companies and others who perform street excavations to inform these organizations of upcoming events and major construction projects with which NYC DOT is involved. Permit Bond. Real-Time Traffic Conditions & Cameras. A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. Some of the activities covered include placement of materials, equipment and temporary structures on the street or movement of construction equipment across roadways and sidewalks. Drawings (Downloads) Standard Sheets - Metric - SI; Standard Sheets - English - USC; PERMITTEE MUST CALL/FAX OEM REGARDING EMERGENCY SITUATION. New York, NY 10004 Tel: 311 or (718) 422-8700, Public Design Commission of the City of New York (PDC) After obtaining HIQA's authorization, the applicant will be referred to the Permit Office in the borough in which the canopy will be located. See Section 3.5.1 Holds for more information. SPECIFICATIONS. If the applicant plans to construct a new vault or enlarge an existing vault, PEU will refer the applicant to NYC DOT's Office of Franchises, Concessions and Revocable Consents for a vault license. (IV) FIVE FEET OF RAIL ROAD TRACKS. WORK HOURS 9 PM TO 5 AM. See the Highway Rules, Section 2-02(l). OCMC will release the hold after it reviews the proposed work and adds the permit stipulations. THIS PERMIT ALLOWS FOR INSTALLATION OF TEMP ROADWAY/PAVEMENT MARKINGS AND/OR TEMP CONSTRUCTION REGULATORY SIGNS AS PER APPROVED MPT PLANS. (212) 839-2399 This information should be used to plan work before streets go into protected street status. For New York City Department of Design and Construction (DDC) capital projects, a CPO hold can only be released by DDC. DURING THESE CLOSURES ALL CONSTRUCTION EMBARGOS AND/OR TEMPORARY CONSTRUCTION PARKING RESTRICTIONS MUST BE COMPLIED WITH. Existing InfrastructurePermittees must not remove parking meters, traffic signs, street lights, street furniture, and similar items unless authorized on the permit. It is essential to call New York 811 before digging anywhere, including sidewalks and soil. One Fordham Plaza, 5th Fl. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. It provides both a thorough update to the guidance in previous iterations and a number of important additions: a new chapter on public programming in streets and public spaces; a host of new entries throughout the Process, Geometry, Furniture, and Landscape chapters; and substantially expanded coverage of several key topics, including bike lanes, inclusive design, and landscape selection and management. NYC DOT Standard Highway Specifications, May 16, 2022 NYC DOT Standard Details of Construction, June 6, 2022 Sewer and Water Main NYC DEP Standard Sewer and Water Main Specifications, August 8, 2022 NYC DEP Specifications for Trunk Main Work, July 2014 NYC DEP Water Main Standard Drawings, December 2020 NYC DEP Sewer Design Standards, August 2018 Similarly, the sooner a potential street excavator knows about NYC DOT's intent to work in a particular location, the better it can make arrangements to avoid or reduce potential conflicts. NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE TYPE 204 PERMIT TO MAINTAIN THE FENCE & AN ACTIVE TYPE 215 PERMIT. Further information on responding to Orders may be found in the Highway Rules, Section 2-02(e). New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. INTRES-RESTORE AS PER SKETCH #7 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. MAINTAIN 8 FOOT CLEAR PEDESTRIAN WALKWAY ON SIDEWALK. TO FRI. OTHER TIMES OCCUPY 11 FEET ADJACENT TO SOUTH CURB ONLY. By accessing this map portal, a utility company or any other entity that performs street excavation work can find details on NYC DOT projects included in the city's 10-year Capital Budget, as well as more imminent NYC DOT and New York City Department of Environmental Protection capital projects currently in design or under construction. WORK 9 PM TO 6 AM NIGHTLY. This chapter describes the different types of permits that are issued by the New York City Department of Transportation (NYC DOT), the one-time permittee registration process, the application procedure for each permit type, and special circumstances and procedures. All other times: (718) 433-3447, The Bronx and North Queens (north of the Long Island Expressway) The applicant may apply directly for this permit type without being a registered permittee, provided he or she can demonstrate proof of required insurance. MOVEMENT RESTRICTIONS ALONG EXTERIOR STREET WILL BE IN EFFECT DURING ALL SPECIAL EMBARGOS AFFECTING THE AREA SUCH AS THE POPE VISIT AND ALL STAR GAME. 22 Reade Street "Backfill" refers to the bottom layer of the restoration. THE CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE THE FINAL RESTORATION STARTS SO THAT HIQA CAN MONITOR THE WORK. Plan Examination Unit To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. The following procedures must be followed to obtain either an emergency authorization number (EAN) for emergency utility access cover work or an Emergency Street Opening Permit Number for emergency street opening work. Learn about ParkNYC. In some cases, applications and supporting documentation must be submitted in person, however the majority of permit applications may be submitted online. WORK 8PM TO 5AM SUNDAY TO FRIDAY MORNING. Either response must be sent to NYC DOT's Division of Bridges at bridgeshold@dot.nyc.gov for review and release prior to commencing work. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. MAY WORK 7AM TO 8PM IN PARKING LANE ONLY TO OPEN UNDERGROUND STREET ACCESS COVERS FOR REPAIRS AND OR CABLE PULLS. If the permit has been expired for more than30 days, a new permit application must be submitted. Bronx, NY 10461 Chapter 3 describes different types of construction-related permits issued by NYC DOT and outlines the application processes for each permit type. To this end, the Street Works Manual is a resource for all parties that perform work in New York City streets, from utilities and contractors installing, replacing and repairing underground infrastructure to developers replacing roadways and sidewalks adjacent to building sites and homeowners performing their own sidewalk repairs. MAINTAIN 5' SIDEWALK AT ALL TIMES. Original insurance certificates for Commercial General Liability (CGL) insurance and Worker's Compensation insurance. Following are the steps for permit application, review and issuance at the central Permit Office: Applications for all other construction-related work, including work on critical streets in Staten Island, can be submitted to the borough office in the borough in which the work is to be performed. StatenIsland.Forestry@parks.nyc.gov Street Opening, Building Operations/Construction Activity, Sidewalk Construction, and Canopy Permits are reviewed and stipulated by OCMC staff. Prior to any permit revocation, NYC DOT will give the permittee an opportunity to be heard with not less than two days' notice. The contact information and hours of operation can be found in Appendix C, NYC DOT Contact Information. Fax: (718) 430-4663 WORK 7 PM - 6 AM WEEKNIGHTS, NO WEEKENDS. or Tax I.D. (212) 748-6670 The citys Climate Resiliency Design Guidelines[PDF] provide guidance on height. 3.1 General Provisions For Construction-Related Permits See, Sidewalks must conform to ADA requirements for a minimum clear-path width and provision of spaces where wheelchair users can pass one another or turn around, Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas, Sidewalks in low-rise residential areas should be at least 5 feet wide, Wherever possible, sidewalk cross-slope should not be greater than 2%, Sidewalks must meet load-bearing, friction, and other requirements per relevant standard specifications and regulations, Color of detectable warning strips on pedestrian ramps should contrast with surrounding pavement: red for, The area within 18 inches of the curb should be kept free of all obstructions, New York City Mayors Executive Order No.22 of 1995 (the Clear Corner Policy) states that to the maximum extent possible, structures and objects should not be placed in the corner quadrant, For recommended clearances between obstructions, see, Include planted areas and stormwater source controls within sidewalks wherever possible when a maintenance partner is identified, If work includes tree planting, consider the location of utility infrastructure, including DEP sewers and water mains, Maximize trees and other green cover wherever clearance allows. ALL UTILITY COMPANIES SHALL BE REQUIRED TO INSTALL THEIR UTILITIES &/OR CONDUITS A MINIMUM OF 18 INCHES BELOW THE ROAD WAY SURFACE OR BASE WHICHEVER IS GREATER AS PER NYC DOT HIGHWAY RULES & REGULATIONS 2-11(11)(VII). Applications for renewal of a canopy maintenance permit must be made at least one month prior to the permit expiration date and must be submitted to the Permit Office in the borough in which the canopy is located. Upon satisfactory payment, the hold(s) will be released. Emergency utility access cover openings and emergency street openings/excavations, Permittee telephone number in case of complaints, Contractor's telephone number, if different from the permittee, The permit number under which the work is being performed, The purpose of the street opening/excavation, The start and scheduled completion dates of the work. When utility company representatives mark a location, they use colored flags and/or paint to identify the type of underground service: Streets can hide a complex infrastructure of underground utilities. All of these signs are metal and include the agency name and sign code. Any emergency work on a street that involves a street opening/excavation requires a Street Opening Permit. NYCStreets system will automatically block an applicant from submission if insurance is not current. WORK ALLOWED 8 AM TO 4 PM SATURDAY. An online permit processing application significantly enhanced the efficiency of NYC DOT permitting operations. Copy of E.I.N. To request release of a CAN hold, the applicant must contact the HIQA borough office in the borough in which the canopy is installed to arrange for a final inspection following canopy installation. MUST MEET ALL REQUIREMENTS AS SET FORTH IN RTE 9A RECONSTRUCTION PROJECT REPAIR DETAILS FOR REPLACEMENT OF 50 YEARS CONCRETE PAVEMENT AND SIDEWALK DATED 9/7/2001. 2016 CT.gov | Connecticut's Official State Website, regular
24 West 61st St., 5th Fl. WORK FROM 7 PM FRIDAY THROUGH 6 AM MONDAY. Further information on insurance and bonds is available in Chapter 3 Permits and Approvals and in Section 2-02(a) of the Highway Rules. BETWEEN THE HOURS OF 12:01AM AND 6:00AM. All street lighting designs must be approved by DOT Street Lighting Engineering Unit. New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . Permit windows at the central Permit Office. the Manual on Uniform Traffic Control Devices, a publication issued by the Federal Highway Administration containing the basic principles that govern the design and use of traffic control devices for all streets, highways, bikeways, and private roads open to public travel. The city has master revocable consent agreements with electric utility companies that allow them to occupy and use city property for transformer vaults. Street Arterial Maintenance (SAM) hold A Street Opening Permit request to perform work on a protected street will automatically have a SAM hold placed on it if the proposed work start date is within 18 months of the street being resurfaced/reconstructed. A valid permit issued by DOB is usually required in order to apply for permits in this category. CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT. Advance notice and coordination of planned street work is one of the most effective tools for reducing the number of street excavations, especially on streets that are scheduled to be resurfaced or reconstructed. More information on this and other "holds" that may be placed on permit applications can be found in, Protected street status for intersections, Active/Future start dates of projects for segments, Active/Future start dates of projects for intersections. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. 66 John Street, 10th Floor The Office of Permit Management (Permit Office) provides extensive customer support for all applicants, registers permittees, receives and reviews for accuracy and completeness permit application submitted in person,and also reviews appropriate fees for both online and in-person applications. New York, NY 10038 Click here for a list of current construction embargoes. New York, NY 10013 Permits are available for various types of work, including Street Opening Permits, Building Operations/Construction Activity Permits, and Sidewalk Construction Permits. WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK MONDAY TO FRIDAY 10 AM-4 PM, SATURDAYAND SUNDAY, WITH NO NOISY OPERATIONS AFTER MIDNIGHT. Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. Tel: (718) 298-7300 NYC Parks & Recreation 8:30 AM to 4:30 PM, Brooklyn For further information, call (212) 839-9435. PERMITTEE MAY BE REQUIRED TO REMOVE CONTAINER IMMEDIATELY UPON NOTIFICATION BY NYCDOT OR AUTHORIZED GOVERNMENT EMPLOYEE. A Full Closure Review (FCR) hold is triggered when a street is closed for 90 days. The second permit for canopy maintenance is automatically placed on a. 47-40 21st Street NO LANE CLOSURES PERMITTED TWO HOURS PRIOR TO BARCLAYS CENTER EVENTS THROUGH TWO HOURS AFTER THE EVENT HAS ENDED. The Street Design Manual is New York Citys comprehensive resource for street design standards, guidelines, and policies. If there is a hold during the processing of the permit, the applicant is notified of the type of hold and the steps to take to release the hold. The Protected Streets Listing consists of four separate files, each covering all five boroughs: All streets on the "Active/Future" lists show the anticipated start date of the project. While Davit and Round poles are also standard poles, cost comparisons to the SS refer to the Octagonal. The applicant will be charged a fee of $30 for each utility access cover opening EAN. AFTER WORKING HOURS MINIMUM OF 5 FEET OF SIDEWALK MUST BE MAINTAINED FOR PEDESTRIANS IN BOTH CASES. An Occupancy of Roadway Permit is required for closing all or part of one or more lanes of roadway and/or during blasting operations. THIS STIP IS USED FOR WORK CROSSING THE ROADWAY OR FOR BPP RESTORATIONS THAT FALL OUTSIDE OF THE HALF PLUS FIVE RULE. West AS COORDINATED WITH COMMUNITY BOARD, CON ED. CPI holds are regularly released by the borough Administrative Superintendent of Highway Operations (ASHO) if the proposed work does not interfere with the in-house street resurfacing operation. Please visit the Manhattan Office, located at 55 Water Street. The pedestal is monolithically poured with the foundation. (If the homeowner is using a contractor, the contractor must be registered with NYC DOT and must take out the permit.) In addition, the streets serve as the access point for the subsurface infrastructure that provides water, sewer, power, and telecommunications services for the city. Street Opening Permits are generally taken out by entities that need access to subsurface infrastructure, including utility companies and contractors, such as licensed master plumbers. The Glossary and definitions found in this Manual provide a brief explanation of NYC DOT terminology. Office hours: Applications accepted, only from 8:30 AM to 12:30 PM;